Paul Small-Boat Harbor has been dredged on 16 occasions. Original construction of this project was completed in 1949. Paul, Minnesota, at Upper Mississippi River mile 839.6 on the right descending bank. Paul Small-Boat Harbor is on the lower end of Harriet Island in St. The length of the harbor is 2,375 feet the width varies from 200 to 400 feet dredged material. The harbor is designed for use by small recreational craft. ![]() Paul Yacht Club, is responsible for all docks and similar facilities at the harbor. The city or its designated operator, the St. ![]() Paul is the non-federal sponsor for the project and is required to furnish a suitable placement site for the dredged material. Paul Small-Boat Harbor to a depth of 5.0 feet below low control pool elevation of 687.2 feet mean sea level (msl). ![]() The Corps of Engineers is authorized to maintain the St.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |